Solar park Bikkelkampen

Solar park Bikkelkampen is one of three initiatives selected by the municipality of Meierijstad for further development, as these initiatives scored highest in terms of spatial quality, technical feasibility and social added value. The solar park initiative will have a capacity of approximately 23 MW. This is equivalent to the average annual consumption of 7,600 Dutch households.

Information & background

The municipality of Meierijstad aims to be energy-neutral by 2050. The Meierijstad municipal council adopted this target in its sustainability vision on 8 November 2018. In addition to the four wind turbines in Veghel, approximately 70 hectares of solar panels on large roofs and 133 hectares of ground-mounted solar panels will be required by 2030 to stay on track towards 2050.

The council committed to 133 hectares by 2030 when it adopted the policy framework for sustainable energy generation. These hectares will be realised in various so-called tranches. The second tranche is currently underway, in which 33 hectares can be developed. The focus of this tranche is on ensuring the solar park is connected in a grid-neutral manner. In this way, the council prevents the grid from being placed under further strain and ensures the solar park does not hinder other sustainable (energy) developments in Meierijstad.

TPSolar initiative

Against the backdrop of municipal policy, TPSolar and the landowners have developed a plan for a solar park with an battery energy storage system (hereinafter: BESS). The solar park will make a significant contribution to the municipality’s sustainability objectives, as well as to those relating to nature and biodiversity.

Resident participation

Resident participation consists of three components: process participation, planning participation and financial participation. Process participation involves contributing ideas to the development of policy and policy frameworks, which is the responsibility not of TPSolar but of the municipality of Meierijstad. This form of participation has been completed by the municipality. The other two forms of participation are currently in full swing.

Design participation

Design participation allows you to have a say in the plans, design, layout, management and maintenance of the solar park. Local residents are actively involved through information on the website, information meetings and informal discussions.

Financial participation

As well as involving local residents in the development of a solar park, it is also important that they can benefit from it. This can be achieved in various ways, for example by co-investing and becoming a co-owner and/or by sharing in the profits via a community fund.

Contact

Do you have a question about the Bikkelkampen Solar Park in Meierijstad? Or would you like to participate in this project?

Please contact project developer Bart Kooken via bart.kooken@tpsolar.nl or 023 741 01 44